5 Common Problems With Traditional Shuttering And How NOVA Plastic Formwork Can Help

The current construction industry requires modern shuttering formwork for suitable solutions that traditional shuttering falls short of. Your construction project faces project delays, safety uncertainties, and extra costs when you utilize old-fashioned formwork methods like concrete or plywood. This blog discusses the five well-known challenges of traditional shuttering methods, along with NOVA Plastic Formwork’s modern alternatives.

 

1. Low Reusability Increases Cost

Most construction professionals recognize how rapidly plywood shuttering deteriorates after usage. The material deforms after only one or two occasions of use. Vertical projects and big-scale construction operations experience higher expenses and delays because of the limited number of reuses required for shuttering formwork replacement. 

 

NOVA Plastic Formwork presents durable, reusable, lightweight panels that maintain their functionality for at least 100 cycles. The material exhibits resistance to warping along with delamination and decay, allowing it to work well in projects requiring demanding conditions and high-rise constructions.

 

2. Weakness Against Moisture and Weather

All property owners know that moisture destroys plywood products. Rainy or damp environments cause expansion, which results in bending or warping among the panels and the formation of mold. 

 

Plastic shuttering from NOVA Formworks provides you with peace of mind when it comes to working in different weather conditions. These formworks are fully resistant to water while also preventing both fungus growth and corrosion. The formwork remains sturdy and dependable under all weather conditions, which reduces both equipment breakdowns and stoppages.

 

3. Poor Finish After De-Shuttering

The characteristic problem of rough finished concrete surfaces becomes evident during de-shuttering. Traditional shuttering creates visible grain marks due to dents, which become even worse through repeated usage. The additional costs for plastering, sanding, and finishing will occur because of this, alongside time loss.

 

The Plastic shuttering India provided by NOVA delivers flawless surfaces during each implementation. The panels need no shuttering oil, thus delivering clean surfaces, eliminating the need for additional plastering. The system introduces value and efficiency into each project stage.

 

4. Complex Designs Are Hard to Execute

The attempt to mold angular or curved concrete shapes or rigid plywood produces exhausting and inefficient results. The operational restriction hinders architects from making their design concepts, therefore requiring manual corrections.

 

Plastic shuttering from NOVA operates as a complete modular unit. The system enables users to alter panel dimensions and angles for any application. The system has quick adjustment capabilities, which reduce expenses while saving time and workers from performing manual tasks in projects that include box culverts and high-rise walls.

 

5. High Labor + Safety Risks

Using heavy plywood or concrete at heights can be risky. They need skilled personnel for effective handling. It is usually the work of more than one person. 

 

The weight of NOVA’s plastic formwork allows single people to easily handle it during operations. The combination of faster setup time and minimal needed tools creates safer working conditions along with higher team efficiency.

 

Conclusion

Current construction requirements exceed what traditional shuttering systems can presently provide. Plastic shuttering India unlocks the most efficient system with enhanced durability, along with high flexibility in design options. NOVA Plastic Formwork offers high-quality plastic formwork solutions for efficient and effortless operations. Each formwork in their product line is of the best quality for efficient construction use.

Comments

Popular posts from this blog

Steel Shuttering Plate for Concrete System - An Overview

Breaking Down The Benefits Of Nova Formwork For Sustainable Building Practices

Why Proper Support Matters In Column Shuttering