Drain Formwork Manufacturer & Supplier in India
Before construction is completed, it has to be put down to set. Since concrete takes about 24-48 hours to set and 28 days to gain the optimal strength, it needs to have support throughout those days. This is where formworks come in. it is a mold in which concrete is added to not only strengthen the structure but also form desired shapes. Formworks can be made from different materials like plastic, steel, and aluminium and come in several shapes and sizes. What are some functional requirements of formwork? ● The form segments should come in a suitable size, which is not only easy to use but transported, and stored as well. ● Every Formworks segment should have symmetry so that they can be interchanged when required. ● Forms should be easy to build. ● Although formworks should be lightweight, they should have enough strength to withstand the pressure and loads. Requirements of good Formwork ● Shrinkage and deflection should be a min